Kanusport-Leverkusen
 Recommend this page

VEREIN FÜR KANUSPORT BAYER LEVERKUSEN 1922 E.V.

 

In order to support the local canoeists, Bayer worked with Brüninghoff to construct a club- and boathouse. On an area measuring 560 m2, Brüninghoff was able to implement the idea for this unusual building shape within six months. Thanks to its modern production halls in Heiden, reinforced concrete sections could be made to order and put together by assembly teams on site. In addition, Brüninghoff’s specialists used various construction materials to shape and strengthen the building’s character.

Download the PDF project sheet here Download Download
 

Project:

New construction of a club- and boathouse

Architecture:
exterior

Primary materials:
Wood
Aluminium

Construction time:
6 Months

Service:
Turnkey