Heek
 Recommend this page

FRANZ-JOSEF HEEK

 

Franz-Josef Heek was able to realise the idea for a complex riding hall by collaborating with construction specialist Brüninghoff and architect Hans Möckel. The Heiden-located hall construction company manufactured steel components in its own production plant, then delivered and assembled them in combination with wood components. The results speak for themselves, in the form of a riding hall with innovative roof strip glazing, multiple horse stalls and lunging halls. After just eight and a half months, riders and visitors were welcomed to the new facility.

Download the PDF project sheet here Download Download
 

Project:

New construction of a riding facility

Architecture:
Hans Möckel

Primary materials:
Ready-cast concrete sections
Steel
Wood

Construction time:
8,5 months

Service:
Partial turnkey