AS-Stahl
 Recommend this page

AS-STAHL GMBH

 

Steel trader AS-Stahl, located in Duisburg harbour, had requirements that were clear and could be implemented with the help of Brüninghoff’s engineering services. Next to the warehouse, a crane system needed to be realised that could load and unload single weights up to 50 tonnes for inland navigation vessels at Europe’s largest inland harbour. Turnkey structures for a warehouse, production hall and administration building were successively constructed at the harbour site, using a combination of steel and reinforced concrete, and assembled on site.

Download the PDF project sheet here Download Download
 

Project:

New construction and extension of a production hall and warehouse

Architecture:
Brüninghoff GmbH & Co. KG

Primary materials:
Ready-cast concrete sections
Steel
Aluminium

Construction time:
34 months

service:
Turnkey